Essar UK Administration Building, Cheshire

Client: Essar UK

Budget: £7.5m

Completed: 2015

The first phase of the project was alterations and re-modelling of the existing 7th floor of the Administration Block to create Executive offices, together with a newly refurbished main entrance at Ground Floor Level.  The remainder of the building was refurbished over a phased period, lasting 5 to 7 years.

We designed the detailed building services engineering.  This includes new ventilation, heating and hot water plant, with sustainable design elements to make the building energy efficient.  In addition we are replacing the entire LV sub-main distribution and equipment network.  The lighting system will be replaced to incorporate energy efficient lighting, complete with automatic controls and daylight dimming functions.  We are carefully programming the work to ensure the building remains fully operational throughout and disruption to building occupiers is minimised.