Location pin Find Us

Ashford & St Peter’s Hospital, Office Block, Chertsey

Client: Extraspace Solutions

Budget: £2.5m

Completed: 2011

The requirement from Ashford & St Peter’s Trust was to provide a two-storey temporary office block at the hospital, with a BREEAM ‘Very Good’ Rating, whilst ensuring services within the complex were unaffected.

We worked with Extraspace Solutions on the resulting 2339 m2, a two-storey modular office building with a third-floor plant room. Each floor consists of a core area with toilet, staff changing area, staff kitchen and lift.

The office accommodation is arranged in a mix of open plan and cellular spaces, with half-glazed office partitions. The meeting rooms are located at ground floor level with a movable partition system subdividing the two smaller rooms.

  • BREEAM Very Good