Location pin Find Us

Trafford Point

Client: H E Simm

Budget: £4.5m

Completed: 2016

The Trafford Point project consisted of two large warehouse units (12,000m2) complete with office accommodation and extensive car parks and access roads. Each warehouse unit has a separate electrical sub-station feeding it, as well as dedicated water and gas supplies.

S I Sealy provided full mechanical and electrical services designs for both buildings, plus the associated car parks and access roads.

A VRF heat pump system with heating and cooling provides heating SCOP Efficiency of 510% (unit 1) and 509% (unit2) and cooling SEER efficiency of 6.32 (unit 1) and 6.37 (unit 2) for the office spaces.

The mechanical AHU has a very low combined specific fan power (SFP) of 0.86 W/l/s (unit 1) and 0.88 W/l/s (unit 2) and a heat recovery of 75% for the office spaces.

A natural gas boiler was provided for communal areas, with an efficiency of 93%, and a zonal extract fan system was provided for the toilet areas with a low SFP of 0.3 W/l/s.

Unit 01
Target Emission Rate (TER)= 17 kgCO2/m2 per year
Building Emission Rate (BER) = 13.9 kgCO2/m2 per year
This is a percentage saving of 18%

Unit 02
Target Emission Rate (TER)= 17.3 kgCO2/m2 per year
Building Emission Rate (BER) = 13.6 kgCO2/m2 per year
This is a percentage saving of 21%

  • VRF Heat Pump System
  • Air Handling Unit
  • Natural Gas Boiler