Lordship Farm Primary School

We worked with Extraspace Solutions on this project, which included the manufacture, installation and fit out of a new stand-alone single-storey classroom building extension, consisting of two class bases, WCs, storage, reception area, segregated plant room and associated groundworks and landscaping.

As it was a requirement of the client brief to target energy levels and adopt the “lean, clean and green” approach, we installed an energy efficient intelligent lighting system which is operated by absence control, in addition to ambient lighting. We also utilised high level vertical windows to bring in natural daylight and ventilation to all areas, operated by CO2 sensors, rain sensors, a traffic light alert system for the teacher and a manual override, thus minimising the necessity for constant artificial lighting.

We also built a large underground soakage blanket in order to utilise the natural rainfall for the betterment of the local flora and alleviate the burden on an already oversubscribed storm drain system.

£486K