Ashford & St Peter’s Hospital

The requirement from Ashford & St Peter’s Trust was to provide a two-storey temporary office block at the hospital, with a BREEAM ‘Very Good’ Rating, whilst ensuring services within the complex were unaffected.

We worked with Extraspace Solutions on the resulting 2339 m2, two storey modular office building with a third floor plant room. Each floor consists of a core area with toilet, staff changing area, staff kitchen and lift.

The office accommodation is arranged in a mix of open plan and cellular spaces, with half glazed office partitions. The meeting rooms are located at ground floor level with a movable partition system subdividing the two smaller rooms.

£2.5 million